Overlay

Redazione

Cost-effective automation

Cost-effective automation
of small production volumes

Fakuma 2017: From the injection-molding machine straight to ultrasonic welding – a space-saving modular robot solution combines several production steps in one flow.

Get to work on two wheels

Get to work on two wheels
New e-bike program for employees

New addition to the mobility and health management program of Herrmann Ultraschall: the company bike.

New and patentend incise drape/swab

New and patentend incise drape/swab
Assembled using ultrasonic welding technology

Herrmann Ultraschall has developed an assembly line to deliver all ultrasonic laminating and sealing steps for a new and patented abdominal swab “texart” by Portugese medical producer Bastos Viegas.

Runner’s high in summer heat

Runner’s high in summer heat
Successful corporate B2run event

At this year’s running competition for companies with over 6.600 participants Herrmann Ultraschall once again contributed with a large team of 74 runners.

Successful Techtextil tradeshow 2017

Successful Techtextil tradeshow 2017
Logo embossing onto vegan leather

In particular when embossing valuable materials like vegan leather or foamed textiles, like car seat upholstery, the optimum feel of the material is often impaired or reduced.

INTERPACK 2017: AMG Generator

INTERPACK 2017: AMG Generator
in Schubert packaging machines

Ideal fit for the invisible electrical cabinet in coffee capsule finishing machines of packaging specialist Schubert, Crailsheim, Germany.

Great stability and short cycle times

Great stability and short cycle times
New process “Compressive staking”

First successful industrial applications in the automotive sector:

Goldstadt 250: it’s official

Goldstadt 250: it’s official
Sponsoring Agreement signed

Because entrepreneurial couple Ingeborg and Walter Herrmann see Pforzheim as starting point for their private and business success, they were happy to finally seal the deal and officially sign the sponsoring agreement - on the occasion of the 8. Sponsoring Lunch Event on February 8th, 2017 at the premises of Herrmann Ultraschall in Karlsbad.

Groundbreaking ceremony for building expansion

Groundbreaking ceremony for building expansion
Floorspace will be doubled

An additional 7.600 qm will be built bringing up the total floor space to 17.100 qm.

He got his Ph. D.!

He got his Ph. D.!
Congratulation to Dr. Francois Brouet

We are proud of Francois Brouet and his final Ph.D. grade and his final excellent doctoral thesis: "Theoretical and experimental analysis of parasitic modal interactions in ultrasonic oscillators"

AVR 3-2017 – Herstellung eines OP Tuches / Automated roll to finished product_DEU/ENG

PDF, 563 kB AVR 3-2017 – Herstellung eines OP Tuches / Automated roll to finished product_DEU/ENG nel carrello download file nel carrello download

Leaders of innovation TOP 100 – Innovation elite

PDF, 318 kB Leaders of innovation TOP 100 – Innovation elite nel carrello download file nel carrello download

ASSEMBLY Magazine 03-2016 – Grab your application by the horn

PDF, 705 kB ASSEMBLY Magazine 03-2016 – Grab your application by the horn nel carrello download file nel carrello download

ASSEMBLY Magazine – With ultrasonics, Company Shifts Welding Into High Gear_12/2015

PDF, 737 kB ASSEMBLY Magazine – With ultrasonics, Company Shifts Welding Into High Gear_12/2015 nel carrello download file nel carrello download

KUNSTSTOFFE 5-2015 Difficult Joining Partners – Cooling Systems for Automotive Use

PDF, 391 kB KUNSTSTOFFE 5-2015 Difficult Joining Partners – Cooling Systems for Automotive Use nel carrello download file nel carrello download

Joining Plastics 3-2015 – Ultrasonic Upsetting_DEU_ENG

PDF, 787 kB Joining Plastics 3-2015 – Ultrasonic Upsetting_DEU_ENG nel carrello download file nel carrello download

PlasticsDecoration 07-08/2014 – Ultrasonic welding with automation and robotics

PDF, 2,0 MB PlasticsDecoration 07-08/2014 – Ultrasonic welding with automation and robotics nel carrello download file nel carrello download

NONWOVENSREPORT 2-2014 New Lab calander

PDF, 1,5 MB NONWOVENSREPORT 2-2014 New Lab calander nel carrello download file nel carrello download

I nostri comunicati stampa e tutte le pubblicazioni sono disponibili in Download.

Mailing list per i comunicati stampa:

Tieniti informato e iscriviti alla mailing list per ricevere i nostri comunicati stampa.

Iscriviti subito